PROFESSION SUMMARY Develop baseline and latest forecast schedules using Primavera 6.
Preparation of Work Breakdown Structure (WBS)
Preparation Distribution of daily and weekly work schedules based on 4week and 3-months look ahead plans to Discipline Engineers
Generation of Weekly Piping Work front based on Spool Control Sheet for assigned area.
Coordinating with Main Client Company for arranging and receiving material according to Priority and raising RFI with Q/C.
Identification and updating requirement of manpower, direct material, direct consumable and equipment based on 3-months look-ahead plan.
Ensuring timely material and spool shifting to site in order to achieve weekly and monthly targets.
Coordination with client, site management and execution team regarding project related activities, progress deadlines and risk mitigation.
Monitoring the project health by critically analyzing project reports on weekly and monthly basis and raise flags in case of slippages from schedule and low productivity
Preparation of progress reports for client and management
Identify and update requirement of manpower, direct material and equipment based on 3 months plan.
Coordinate with HSE team to train and educate the site team and ensure use of safety procedures and equipment.

پراجیکٹس

UPPER ZAKUM ISLAND DEVELOPMENT PROJECT

تجربہ

کمپنی کا لوگو
Lead Planning Engineer
Descon Engineering
اگست ۲۰۱۵ - دسمبر ۲۰۱٦ | Abu Dhabi, United Arab Emirates

09/2015-Present Descon Engineering Company Limited Abu Dhabi, UAE.
Currently Working Offshore at UPPER ZAKUM (ZADCO) Island Development Project on UZ-750 Project.
Responsibilities:
• Development of Base Line Schedule using Planning Software PRIMAVERA (P6).
• Develop and maintain plans and schedules deliverables at all levels of management with inputs from engineering, construction and commissioning
• Preparation of Weekly; Monthly & Three Months look-ahead Schedule.
• Updating actual Progress and all related information & comparison analysis.
• Project Scope Management
• Review and forecast Contractor Work front availability and conduct continuity of work analysis.
• Tracking and maintain scope changes of Mechanical items for Piping; Structural Steel; Piping & Mechanical Equipment’s and its effect on the overall project schedule.
• Resources Estimation and Loading in P6 plan.
• Estimation of Manpower Requirement for the Project based on standard productivity norms.
• Monitoring of actual resources availability & analysis using Histogram.
• Budget Monitoring & estimation.
• Preparing progress % calculation systems, earned man-hours, productivity & Trend analysis.
• Progress Measurement using S Curves.
• Preparation Executive Progress Summary Report to the Top Management on Project Status for periodical review.
• Evaluated and communicated the results of Work Front Analysis.
• Prepare and monitor Risk and Issues Register.
Descon Engineering Company Limited Abu Dhabi, UAE Worked on a Planning Package of ADCO-SAHIL Development Project Phase-2.
Responsibilities:
• Study of contract documents and develop scope of work.
• Development of Base Line Schedule using Planning Software PRIMAVERA (P6).
• Develop and maintain plans and schedules deliverables at all levels of management with inputs from engineering, construction and commissioning Preparing schedule, Planning & Progress Reports/Statements.
• Creation of project budget and monitoring of the cost incurred.
• Preparation & Distribution of daily and weekly work schedules and S-Curves based on 4‐week and 3-months look ahead plans to Discipline Engineers.
• Generation of Weekly Work front based on Material Control Sheet for assigned area.

کمپنی کا لوگو
Planning Engineer
Descon Engineering
ستمبر ۲۰۱۴ - جولائی ۲۰۱۵ | Doha, Qatar

09/2014-10/2014 Descon Engineering & Construction Company Qatar L.L.C Doha, Qatar
Worked as a Shut Down Planning Engineer at Qatar GAS with Descon Engineering Limited
Position: Planning Engineer (Mechanical)
Project: Annual Shut down – Qatar Gas Train 4 & 5
Location: Qatar Gas (Qatar Petroleum) Ras-Laffan, Qatar.
Project Date: 09/2014-10/2014
Responsibilities:
• Study of contract documents and develop scope of work.
• Preparation of level 4 plan in MS Project
• Generation of manpower and equipment deployment plans.
• Coordination with Subcontractors for expediting the job and keeping progress follow ups.
• Creation of project budget and monitoring of the cost incurred.
• Carry out necessary changes in the plan due to Scope change or Operational changes in the equipment release.
• Generation of Weekly, Fortnightly and Monthly progress reports.
• Close liaison with client regarding progress and scope variations.
• Submission of monthly progress invoices to client.

10/2014-Present Descon Engineering & Construction Company Qatar L.L.C Doha, Qatar
Currently working on Shutdowns and Train Extension Project with Descon Engineering Limited under supervision of Chiyoda Almana.
Position: Planning Engineer (Mechanical)
Project: CONTINOUS EMISSION MONITORING SYSTEM (CEMS) OVERALL SCOPE
Location: Ras Gas (Qatar Petroleum) Ras-Laffan, Qatar.
Project Date: 10/2014-03/2016 (Expected Date to Complete).
Responsibilities:
• Preparation of Level IV plan (Resource loaded) on Primavera P6 as per Client requirement.
• Preparing schedule, Planning & Progress Reports/Statements.
• Creation of project budget and monitoring of the cost incurred.
• Preparation & Distribution of daily and weekly work schedules and S-Curves based on 4‐week and 3-months look ahead plans to Discipline Engineers.
• Generation of Weekly Work front based on Material Control Sheet for assigned area.
• Preparation of indents and follow up with commercial team for timely delivery of items.
• Preparation of Scope Variation order requests and record keeping of all approved variation orders.
• Procurement of project material as per BOQ/MTO (such as piping, fittings, valves, steel structure, E&I and civil materials.)
• Coordinating with Main Client Company for arranging and receiving material according to Priority and raising RFI with Q/C.
• Getting the Material approved from client as per Ras Gas standards.
• Identification and updating requirement of manpower, direct material, direct consumable and equipment based on 3-months look-ahead plan.
• Visiting Site daily to get updated progress.
• Meetings with Client for the additional jobs at site and also Prepare the Cost Impact for the additional jobs.
• Coordination with client, site management and execution team regarding project related activities, progress deadlines and risk mitigation.
• Monitoring the project health by critically analyzing project reports on weekly and monthly basis and raise flags in case of slippages from schedule and low productivity
• Preparation of progress reports for client and management
• Coordinate with HSE team to train and educate the site team and ensure use of safety procedures and equipment.

کمپنی کا لوگو
Mechanical Engineer
SAUDI AKHWAN CO. LTD.
فروری ۲۰۱۲ - اگست ۲۰۱۴ , Saudi Arabia

 Reviewing the Drawings
 Tagging the drawing (Making B.O.Q)
 Management of structural project from planning, fabrication to installation.
 Managing and maintaining all Shutdown of machines, Preventive Maintenance Scheduling and Planning.
 Man power and Resource Management.
 Analyzing scope of work & scope of supply.
 Estimation of equipment, tools, consumables.
 Responsible to analyze actual progress, man-hours consumption, productivity, work sequence of the concerned areas in liaison with the client.
 Supervising the whole store inventory and Procurement system generating M.R, P.O and G.R.N.
 Updating Purchase log form for the identification of whole purchase system at any moment.
 Planning and Coordinating with the Planning Team for the Site Project.
 Estimating of material requirements after study of vendor drawings & specifications.
 To visit the construction site daily to check whether all works, materials, equipment, are in accordance with QA/QC program, Project drawing & specification. When defective materials, equipment, or workmanship are found, immediate action to be taken to correct them, & to report the corrective action to the Site Superintendent.
 Planning / organizing and checking of work progress & schedules to meet the deadlines/target dates & implementing QA/QC plans.
 Conducting through stage-wise inspection as per procedures as well as alignment & assembly of equipment at site during installation.
 Give prime importance to human and assets Safety & Maintain Quality and safety standards.
 Take measures for security of tool, plant and equipment and other assets being used by teams.
 Creating safe working environment, managing risks, reducing exposure to hazardous liability and ensuring implementation of QHSE policy
 Performed ISO 9001-2008 Internal Audit of Company as a M.R (Management Representative) and certified the Company from ISO Auditor.

کمپنی کا لوگو
Internee
Haier Pakistan (Pvt) Ltd.
اگست ۲۰۱۰ - ستمبر ۲۰۱۰ | Lahore, Pakistan

کمپنی کا لوگو
Internee
Century Paper and Board mills Limited
جولائی ۲۰۱۰ - اگست ۲۰۱۰ | Patoki, Pakistan

کمپنی کا لوگو
Internee
Crescent Bahuman Limited
جولائی ۲۰۰۹ - اگست ۲۰۰۹ | Faisalabad, Pakistan

تعلیم

University of Engineering & Technology
بیچلرز, , Bachelors in Science‎
Mechanical engineering
2011

پیشہ ورانہ مہارتیں

ماہر Corporate IT
ماہر Corporate Marketing
ماہر Corporate - Procurement / Administration Departmen
ماہر Distributors
ماہر Individuals / Consumers
ابتدائی Lead in
متوسط Pipeline Management
ماہر Rural Markets Knowledge
ماہر مبيعات القناة
ماہر تسويق الشركات

زبانیں

ماہر اردو
ماہر انگریزی
ابتدائی عربی

آپ کن کمپنیز کی پیروی کر رہے ہیں